Operational Performance for the nine months ended 31 March 2017

19 March 2018

 

 

9 months ended 31 March

 % change

 

2017

2016

 

 

 

 

 

Electricity
 

 

 

 

Customers1, 6

553,806

548,279

1.0%

New connections
Net movement in customers2

6,505
3,753

5,855
3,766

11.1%
(0.3%)

Volume distributed (GWh) 3

6,219

6,273

(0.9%)

SAIDI (minutes) – 12 months to 31 March4

 

 

 

  Normal operations

173.3

117.0

48.1%

  Extreme events

38.8

7.8

397.4%

  Total

212.15

124.8

70.0%

 

 

 

 

Gas Distribution7
 

 

 

 

Distribution customers1, 6

106,544

103,717

2.7%

New distribution connections
Net movement in distribution customers2

2,749
2,222

2,486
2,152

10.6%
3.3%

Distribution volume (PJ)

10.5

10.3

1.9%

 

 

 

 

Gas Trading
 

 

 

 

Natural gas sales (PJ)8

13.5

12.6

 7.1%

Gas liquid sales (tonnes)9

53,264

56,835

(6.3%)

9kg LPG bottles swapped10
Liquigas LPG tolling (tonnes)11

456,658
120,126

427,723
130,912

6.8%
(8.2%)

 

 

 

 

Technology
 

 

 

 

Electricity: smart meters1, 12

1,242,179

1,086,508

 14.3%

 

 

  1. As at 31 March.
  2. Net number of customers added during the period, includes disconnected, reconnected and decommissioned ICPs.
  3. Volumes were impacted by the partial closure of a significant industrial customer in October 2015.
  4. Regulatory year – 12 months to 31 March.
  5. SAIDI (minutes) for the 12 months ended 31 March 2017 is an unaudited value and subject to change.
  6. Billable ICPs.
  7. The group’s gas transmission and non-Auckland gas distribution business (Vector Gas) was sold to First Gas on 20 April 2016.  The operating statistics for the period to 31 March 2017 relate only to the Auckland network, and the prior period comparatives have been adjusted accordingly.
  8. Excludes gas sold as gas liquids.  These sales are included within the gas liquids sales tonnages.
  9. Total of retail and wholesale LPG and natural gasoline.
  10. Number of 9kg LPG bottles swapped and sold during the year.
  11. Includes product tolled in Taranaki and further tolled in the South Island.
  12. The number of smart meters deployed as at 31 March 2017 includes 90,515 meters managed but not owned by Vector (31 March 2016: 45,080).