Sarawia St, Laxon Tce and Youngs Lane – Newmarket was completed on 12 Apr 2010
Start Date:
26 Jan 2010
Completion Date:
12 Apr 2010

Project File

Vector is carrying out an undergrounding project on Sarawia St, Laxon Tce and Youngs Lane, Parnell. 

This work is being undertaken as part of the Auckland Energy Consumer Trust (AECT and Vector’s long term plan to put the remaining overhead power lines underground in the urban areas of Auckland, Manukau and Papakura.
 
‘Dig once’ strategy
As part of our ‘Dig Once’ strategy we will be coordinating our work with Telecom, and the overhead power and telephone lines will be replaced with underground cables at the same time. We are also working with Auckland City Council who will be installing new streetlights as part of this project.

Streets affected by this work include: Both sides of Sarawia St; the eastern side of Laxon Tce; and the northern side of Youngs Lane.
 
Project timing: January 2010 – April 2010
 
Project details:
All overhead lines in the street, and customer power and phone lines within the works area which are a single span will be undergrounded. We will also underground lines down shared driveways for the first span.
 
The power supply in the area should not be affected by the work, except for when the change over from the old overhead to the new underground service to a property is required. A short power outage will be needed for each property to complete this process. We’ll talk to affected customers before we carry out this work.
 
The works should only directly affect the road frontage outside each property for a small amount of the construction period.
 
To ensure a safe and smooth flow of traffic, full traffic management plans are in place for the area. The work sites have been designed so that pedestrians will still be able to pass by the works. In most cases, the flow of traffic will be maintained.
 
Hours of work are expected to be between 8:00am and 5:00pm Monday to Friday, though work outside of these hours may be needed to suit project operational requirements. 
 
Every effort will be made to ensure disruption is kept to a minimum. We apologise in advance for any inconvenience this project may cause and thank you for your cooperation while this work is underway.
 
If you would like further information, please call Vector on 09 303 0626

Comments

Ask us a question or comment here

The content of this field is kept private and will not be shown publicly.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Allowed HTML tags: <a> <em> <strong> <cite> <code> <ul> <ol> <li> <dl> <dt> <dd>
  • Lines and paragraphs break automatically.

More information about formatting options

CAPTCHA
This question is for testing whether you are a human visitor and to prevent automated spam submissions.