Vector is undertaking an cable replacement project in the Rocky Bay area on Waiheke Island to improve network reliability and ensure that our customers continue to receive a secure power supply.
Streets affected: O'Brien Road, Margaret Reeve Lane and Valley Road on Waiheke Island
Project timing: November 2009
Project details:
We will be installing a new electricity cable in the Rocky Bay area.
The power supply should not be affected in any way while this work is being carried out. In the unlikely event that a planned power outage is required, notification will be given in advance to this occuring.
Full traffic and pedestrian management plans will be in place and in most cases the directional flow of both traffic lanes will be maintained. Every effort will be made to ensure disruption is kept to a minimum. The work sites have been designed so that pedestrians will still be able to pass by the works.
We apologise, in advance, for any inconvenience this project may cause and thank you for your patience and cooperation while the work is underway.
If you would like further information, please call Vector on (09) 303 0626